Everglades plan could siphon county’s drinking water

  Comments (...)
Text Size: AaAaAaAaAa

The Central Everglades plan is designed to finally help the ailing heart of the Everglades — moving more water through state-owned water conservation areas south of Lake Okeechobee, down through the Shark River Slough, the historic headwaters of Everglades National Park and finally out into Florida Bay.

Though the plan wouldn’t do everything called for in the larger $13.5 billion restoration plan, which was expected to take decades to complete, it would represent a major first step toward restoring natural flow to a system long bottled up by dikes and drainage canals.

The plan calls for siphoning water currently released from the lake and “lost to tide” down the Caloosahatchee and St. Lucie rivers and redirecting it to the south.

The water — up to 65 million gallons annually — is intended to refresh long-parched swaths of the Glades and too-salty Florida Bay and offer relief to sections of state-owned marsh where water has historically been held too high, destroying tree islands and reducing wildlife populations. After studying four alternatives, a working group hammering out the plan made a tentative choice last month, combining features from two alternatives. The new plan, known as 4R, includes nearly 20 separate projects to backfill portions of canals, remove or shorten levees, add gates and pumps, extend bridging along Tamiami Trail and remove the old road bed.

It also includes an underground wall called a “seepage barrier” south of Tamiami Trail designed to reduce the flow of groundwater from the Everglades east toward the suburbs. Because South Florida’s porous limestone geology behaves much like a sponge, adding water on one side of a levee tends to raise ground water levels on the other side as well, which can reduce the drainage capacity of canals and increase suburban flood risks.

Computer modeling last month, however, showed the design cut off so much seepage it reduced water flows to Miami-Dade’s well fields — an impact the county wants alleviated before endorsing any plan.

“We have very serious concerns at this point, and we aren’t prepared to support 4R for sure and probably any of the others until we can see some actual results of whatever can be done to address the shortcomings,” said Susan Markley, a section chief for the county’s division of environmental resources management.

||2|Next Page

Comments

Total Comments
0

View/Add Comments

There have been no comments made about this story.

Blogs

» Out Here
Out Here

Watch where you sit

On Tuesday, the Lee County Board voted 12-9 to approve a proposed wind farm in the southwestern part of the county. That happened after 27 sessions of a public hearing held by the Zoning Board of Appeals. Is everyone wiser for it?
» Out Here
Out Here

Good or bad? Depends on who you ask

Sometimes readers ask for more good news in the paper. They say we in the media only cover the bad. But one person's positive is another's negative.

Reader Poll

Memorial Day weekend heralds the arrival of summer vacation season. How much time do you plan to spend on vacation?

1 week
2 weeks
3 or more weeks
No vacation this year